| 1. | Initially, large deformations take place as a result of grain movements and readjustments . 最初,由于颗粒的移动和调整而使多孔介质发生较大变形。 |
| 2. | Measurement of large deformation of material 冲击拉伸载荷下材料大变形的测量方法 |
| 3. | Optimum algorithm for large deformation of simply - supported beam 简支梁大变形的优化算法 |
| 4. | The large deformation and control strategy of huocheling tunnel 火车岭隧道围岩大变形问题及治理 |
| 5. | Control technology of large deformation of wushaoling tunnel f7 soft faultage 7软弱断层大变形控制技术 |
| 6. | Nonlinear finite element analysis for large deformation of passat b5 ' seal 5密封条大变形非线性有限元分析 |
| 7. | Analysis of large deformation regularity in stratum above metro tunnel 地铁暗挖隧道上覆地层大变形规律分析 |
| 8. | Nonliner finite element analysis for large deformation of passat b5 seal 5车门密封条大变形非线性有限元分析 |
| 9. | Finite element analysis of large deformation of compressed rubber component 压缩状态下橡胶件大变形有限元分析 |
| 10. | Discussion and study on large deformation of tunnel in squeezing ground 关于挤压性围岩隧道大变形的探讨和研究 |